| Land Preparation
|
| -6 to –7 |
- Plough the field followed by harrowing till the required tilth
is obtained. Keep the field in a receptive state to absorb as
much moisture as it can from monsoon showers.
- Add 10-15t of FYM or compost before last ploughing or sheep
penning in summer months.
|
| Seed Treatment |
| -6 |
- Treat the seed with conc H2So4 for delinting
- Dry the seed in shade.
|
| -4 |
- Soak the seed in water for 24 hours - shade dry the seed
|
| -3 |
- Treat the seed with seed dressing chemicals against seed born
disease.
|
| -2 |
- Level the field with blade harrow.
|
| Crop Management |
| -0 |
- Sow the seed by seed drill either in anticipation of rain a
week in advance or immediate of on receiving of monsoon with seed
drill.
|
| +7 to +10 |
- Gap fill the rows with soaked seed.
|
| Weed Management |
| + 20, +30 , +40, +50 + 60 +70
+80 +90 |
- Inter cultivate between rows with tyned harrow followed by blade
harrow.
- Remove weeds manually between plants with in rows.
- Manage floral parts shedding by spraying Alpha NAA 10 ppm 3
or 4 times at weekly intervals.
|
| Nutrient Management
|
| -0 to +45 |
- Apply entire recommended dose of N & P at the time of sowing
by placement behind gorru. (5-6 cm deep)
|
| Harvesting |
| +100-120 |
- First picking of cotton – pick the cotton from fully opened
bolls. Clean picking - kapas should be free from dried broken
plant bits – keep diseased kapas and undeveloped kapas separately.
|
| +120-140 |
|
| +120-160 |
|
| Pest Management
|
| |
- Monitor the pest and disease incidence accordingly the plant
protection – measures should be taken up.
- Adopt IPM measures.
|