Potato

Management Time Table

Early Sown Crop (90 days) Main Crop 110 Days Late Sown Crop ( 120 days) Seed crop (155 days)

Early Sown Crop (90 days)

    Days
    Operations and Physiological stage
    -10 Land preparation and farm yard manure application
    -9 Mixing of FYM in to the soil
    -7 Transportation of seed from cold storage and placement in diffused sunlight for acclimatization
    -1 Seed treatment with Agallol or Emissan
    0 Basal application of fertilizer by broadcasting before ridge formation
    0 Ridges formation and sowing
    1 Application of first irrigation
    2 Application of pre-emergence herbicides
    6 Application of post emergence herbicides
    8 Germination
    35-40 Earthing-up and application of nitrogen fertilizer
    40 Initiation of tuber formation
    60 Mild tuber formation
    80 Peak of tuber formation
    88 Harvesting / digging of Potatoes
    89 Packing of Potato
    90 Marketing of Potato

Top

Main Crop 110 Days

Days
Operations and Physiological stage
-12 Pre-land preparation irrigation
-10 Land preparation and farm yard manure application
-9 Mixing of FYM into the soil
-7 Transportation of seed from cold storage and placement in diffused condition for acclimatization
-1 Seed treatment with Agallol or Emissan
0 Basal application of fertilizer by broadcasting before ridge formation
0 Ridge formation and sowing
1 Application of first irrigation
2 Application of pre-emergence herbicides
7 Application of post emergence herbicides
10 Germination
40 Earthing-up and application of nitrogen fertilizers
50 Initiation of tuber formation
70 Mild tuber formation
100 Peak of tuber formation
108 Digging-up of Potatoes
109 Grading and packing
110 Marketing

Top

Late Sown Crop ( 120 days)

Days
Operations and Physiological stage
-12 Pre-land preparation irrigation
-10 Farm yard manure application
-9 Spreading of FYM and land preparation
-7 Transportation of seed from cold storage and placement in diffused sunlight / under shade or in aerated rooms.
-1 Seed treatment with Agallol or Emissan
0 Basal application of fertilizer by broadcasting before ridge formation
0 Ridge formation and sowing
1 Application of first irrigation and pre emergence herbicides
2 Application of second irrigation
7 Application of post emergence herbicides
10 Germination
45 Earthing-up and application of nitrogen fertilizer
50 Initiation of tuber formation
80 Mild tuber formation
110 Peak of tuber formation
118 Digging-up of Potatoes
119 Grading and packing
120 Marketing

Top

Seed crop (155 days)

Days
Operations and Physiological stage
-12 Pre-land preparation irrigation
-10 Application of farm yard manure
-9 Spreading of FYM and land preparation
-7 Transportation of seed from cold storage and placement in diffused sunlight / under shade or in aerated rooms
-1 Seed treatment with Agallol or Emissan
0 Basal application of fertilizer by broadcasting before ridge formation
0 Ridge formation and sowing
1 Application of first irrigation
2 Application of pre-emergence herbicides
7 Application of second irrigation
10 Germination
45 Earthing-up and application of nitrogen fertilizer
50 Initiation of tuber formation
90 Complete tuber formation
92 Cutting of haulms
150 Digging-up of Potato
153 Grading and Packing
155 Transportation for storage in cold storage



Top

Telangana