Main Field Preparation and Management Time Table (For Tamilnadu) (For one ha)
Operations | Days | Short duration | Days | Medium duration | Days | Long duration |
---|---|---|---|---|---|---|
-10-15 days (before trans-planting) | - |
Plough the field, apply FYM or compost 12.5 tonnes or green manure 6.5 tonnes irrigate the field and decompose it | - |
Plough the field, apply FYM or compost 12.5 tonnes or green manure 6.5 tonnes irrigate the field and decompose it | - |
Plough the field, apply FYM or compost 12.5 tonnes or green manure 6.5 tonnes irrigate the field and decompose it |
-2-3 days (before transplanting) | - |
Puddle the field and trimming of bunds | - |
Puddle the field and trimming of bunds | - |
Puddle the field and trimming of bunds |
-1 day (before or at transplanting) biofertilizers can be applied based on the availability | 25 |
Basal application of N:P:K 30:40:10 kg/ha, level the field | 30 |
Basal application of N:P:K 37.5:50:12.5 kg/ha, level the field | 35 |
Basal application of N:P:K 37.5:50:12.5 kg/ha, level the field |
Seedling root treatment | - |
With Pseudomonas flourescens @ 1.5 kg + Azospirillum 1 kg | - |
With Pseudomonas flourescens @ 1.5 kg + Azospirillum 1 kg | - |
With Pseudomonas flourescens @ 1.5 kg + Azospirillum 1 kg |
Transplanting spacing | 25 |
12.5 x 10 cm 80 hills/sq.m | 30 |
20 x 10 cm 50 hills/sq.m | 35 |
20 x 15 cm 33 hills/sq.m |
Weedicide application |
28-30 |
Mix the recommended chemical with sand and apply over a thin film of water. Do not drain water for 2-3 days |
33- 35 |
Mix the recommended chemical with sand and apply over a thin film of water. Do not drain water for 2-3 days |
38-40 |
Mix the recommended chemical with sand and apply over a thin film of water. Do not drain water for 2-3 days |
First hand weeding (if weedicide is not applied) |
40 |
- |
50 |
- |
55 |
- |
Top dressing I (kg) | 40 |
N : P : K 30 : 0 : 10 |
50 | N : P : K 37.5:0:12.5 |
55 | N : P : K 37.5:0:12.5 |
Second hand weeding (if needed) | 55 | 70 | 80- 85 | - | - | - |
Top dressing II (kg) | 55 | N : P : K 30 : 0 : 10 |
70 | N : P : K 37.5:0:12.5 |
80-85 | N : P : K 37.5:0:12.5 |
Top dressing III (kg) | 70 | N : P : K 30: 0 : 10 |
90 | N : P : K 37.5:0:12.5 |
110-120 | N : P : K 37.5:0:12.5 |
Irrigation | - | Thin film of water at planting; raise the level according to the plant height and maintain 5 cm of water level during crop growth. Stop irrigation 10 days before harvest | - | Thin film of water at planting; raise the level according to the plant height and maintain 5 cm of water level during crop growth. Stop irrigation 10 days before harvest | - | Thin film of water at planting; raise the level according to the plant height and maintain 5 cm of water level during crop growth. Stop irrigation 10 days before harvest |
Pest and disease | - | Need based IPM | - | Need based IPM | - | Need based IPM |
Harvesting | 110-115 |
135-140 |
155-160 | |||
Reduce moisture content to 12-13 percent in the harvested grains |
Note: Select short duration varieties for Navarai/sornavari/kar and kuruvai seasons; long duration varieties for samba seasons and medium duration varieties for late samba and the thaladi/pishanum seasons.
Tamilnadu
Rice
-
About Rice
- History
- Rice Management
- Varieties
- Management Time Table
- Land Preparation
- Cropping Seasons
- Crop Establishment
- Nutrient Management
- Water Management
- Weed Management
- Insect Management
- Disease Management
- Rodent Management
- Nematodes
- Harvesting and Storage
- Marketting
- Seed production
- Hybrid Rice
- Yield Maximization
- Crisis Management
- System of Rice Intensification(SRI)