Introduction

  • Major input cost components in groundnut cultivation in India are seed cost and labour component.
  • Seed is the major item of input cost varying from 35.20% to 46.88% for irrigated crop and 26.23% to 37.47% for rainfed crop.
  • Human labour occupies the second place in the cost structure which will vary from 23% to 25%.
  • Bullock labour is another important item costing about 15-20%.
  • The total labour cost vary any where betwwen 44-50% in India.

Top

Cost of Cultivation of Groundnut on average basis

Description
Cost/ha (Rs.)
A. Variable cost
 
1. Land preparation
 
4-ploughing 1-pare of black and 1-labour for 12-days
1800.00
2. Compost and Chemical fertilizers
 
a. 25 bulluck carts load compost
1250.00
b. Fertilizers
-
c. Transportation of compost 1 pare of bullock for 2days
300.00
d. Spreading of compost 3 labors
150.00
3. Seed & Sowing
 
a. 72 kgs Seed @ 12Rs.perkg
864.00
b. Sowing 3 pare of bullocks 6 labour
600.00
4. Insecticides
 
5. Irrigation
300.00
6. Intercultural 20 labour weeding 15labour earthling
1750.00
7. Harvesting or Digging 40 labours
2000.00
8. Transportation and separation of pods
 
9. Maintenance of Implements
72.00
10. Interest on Working capital
244.12
Total
9258.12
B. Fixed Costs
 
Land revenue or Rental value of the land
3000.00
Depreciation
72.00
interest on fixed capital
153.50
Total
3225.50
C. Risk and uncertainties
1388.71
Total cost of production (A+B+C)
13872.33
1. Groundnut 40qt. @ Rs.1300per/qt.
18200.00
2. Total income
18200.00
3. Net income
4327.67
4. Cost of production/qt.
990.88

Total human labour 816hours per hectare and total bullock labour 144hours per hectare.

Note :

The cost of production factors is given below :

1. Human labour
Rs. 50 per day
2. Bullock labour
Rs. 100 per day
3. Compost
Rs. 50 per cart load
4. Chemical fertilizers nitrogen
Rs. 10 perkg.
5. Irrigation charges (Tube well)
Rs. 250 per irrigation
6. Implement maintenance
Rs. 0.50 per hour of bullock labour
7. Interest on working capital
13% of the cost of production half duration
8. Depreciation
Rs. 0.50 per bullock labour hour
9. Interest on fixed capital
10% of fixed cost for half year
10. Risk and uncertainties
15% of variable cost