Rice

Rabi

Krishna Godavari Zone North Coastal Zone Southern Zone Scarce Rainfall Zone

Management time table for Krishna Godavari Zone-Rabi

Note: Time table is for a medium duration variety (120 days). Numbers refers to days relative to days after transplanting (DAT)

-25
0
20
35
60
65
100
Nursery Management
Planting
Max tillering
P.I
Heading
Flowering
Maturity

Pre-Plant Management
Nursery Management(10% of transplanted area)
-30
  • Plough the field
  • Apply 200-300 kg FYM/100 m2
  • Flood the field and Puddle thoroughly
-25
  • Raise seed beds - 1 ½ m width - convenient length -30 cm channels in between beds
  • Apply 1kg N + 0.5 kg P2O5 +0.5 kg K2O/ 100 m2
  • Broadcast the seed uniformly
  • Avoid excess water
-27
  • 5-6 kg seed / 100m2
  • Remove ill -filled grain (2% salt water)
  • Thiram / Captan treatment (3g/kg seed)
  • Incubate for 24-36 hours
Land Preparation
-10 to -15
  • First puddling
  • Add green manure-incorporate / Apply FYM
-3 to -5
  • Give second puddling
-1
  • Give third puddling
  • Allow allays of 20 cm for every 2m width
  • Level the land perfectly
Crop Establishment
0
  • Maintain 3+- 2 cm water level
  • Transplant young (25 days age) seedlings (4-6 leaf stage) Shallow (2-3 cm depth), close (20 x 15 cm) planting advantageous
  • See that there should be 33 seedlings / m2
  • Increase seedling number (close spacing) if planting is delayed or less fertile soil
+12 to +15
  • Fill gaps by transplanting
Weed Management
Note: Timing of herbicide application is very important relevant to the day of last puddling but not the day of transplanting.
-20 to -25
  • Spray 2,4-D sodium salt (5-12 kg/ha) on fresh growth of Cyperus (if Cyperus weed intensity is high)
  • Plough after one week of spray
  • Plant paddy after 20-25 days
-10 to 12
  • Spray glyphosate (2.5 - 3.5l/ha) on fresh growth of Cyperus (if Cyperus weed intensity is high)
  • Plough after one week of spray
  • Plant paddy after 10-12 days
3 to 5
  • Apply 2,4-D ethyl - ester granules @ 0.8 kg 2/ha Butachlor or Benthiocarb (1kg /ha for light soils / 1.5 kg a.i/ha for heavy soils)

Nutrient Management
Zone Season Stage N P K Zn
Kg/acre
Krishna-Godavari zone

Rabi (fertile Soils)

a) Last puddling 16 -- -- --
b) 20 DAT 16 -- -- --
c) Panicle initiation stage 16 -- -- --
Rabi (low fertile) a) Last puddling 16 24 20 20
b) 20 DAT 16 -- -- --
c) Panicle initiation stage 16 -- -- --
Water Management
0
  • Less water depth (2-3 cm) for easy and shallow transplantation
+1 to + 2
  • Increase the level of water in the field (5-7 cm) for better establishment of seedlings
+3 to 40
  • Maintain shallow water depth (2-3 cm)
+30 to 32
  • Drain the water completely and dry for two days(only for heavy soils)
+30 to+65
  • Increase water level in the field (5-7 cm) Most critical period for moisture
+70 to 85
  • Reduce water depth to (2-3 cm)
+85
  • Gradually with draw water from field (for matuation and easy harvest)
Pest and disease management
  • Monitor the pest and disease incidence and accordingly the plant protection measures have to be taken up.
Post production
+90 to 100
  • Crop may attain physiological maturity
  • Drain the field 10-15 days before harvest
  • Harvest the crop around 20-25% moisture in the grain.

Top

Management time table for North coastal Zone-Rabi

Note: Time table is for a medium duration variety (120 days). Numbers refers to days after transplanting (DAT)

-25
0
20
35
60
65
100
Nursery Management
Planting
Max tillering
P.I
Heading
Flowering
Maturity

Pre-Plant Management
Nursery Management(10% of transplanted area)
-30
  • Plough the field
  • Apply 200-300 kg FYM/100 m2
  • Flood the field and Puddle thoroughly
-25
  • Raise seed beds - 1 ½ m width - convenient length -30 cm channels in between beds
  • Apply 1kg N + 0.5 kg P2O5 +0.5 kg K2O/ 100 m2
  • Broadcast the seed uniformly
  • Avoid excess water
-27
  • 5-6 kg seed / 100m2
  • Remove ill -filled grain (2% salt water)
  • Thiram / Captan treatment (3g/kg seed)
  • Incubate for 24-36 hours
Land Preparation
-10 to -15
  • First puddling
  • Add green manure-incorporate / Apply FYM
-3 to -5
  • Give second puddling
-1
  • Give third puddling
  • Allow allays of 20 cm for every 2m width
  • Level the land perfectly
Crop Establishment
0
  • Maintain 3+- 2 cm water level
  • Transplant young (25 days age) seedlings (4-6 leaf stage) Shallow (2-3 cm depth), close (20 x 15 cm) planting advantageous
  • See that there should be 33 seedlings / m2
  • Increase seedling number (close spacing) if planting is delayed or less fertile soil
+12 to +15
  • Fill gaps by transplanting
Weed Management
Note: Timing of herbicide application is very important relevant to the day of last puddling but not the day of transplanting.
-20 to -25
  • Spary 2,4-D sodium salt (5-12 kg/ha) on fresh growth of Cyperus (if Cyperus weed intensity is high)
  • Plough after one week of spray
  • Plant paddy after 20-25 days
-10 to +12
  • Spray glyphosate (2.5 - 3.5l/ha) on fresh growth of Cyperus (if Cyperus weed intensity is high)
  • Plough after one week of spray
  • Plant paddy after 10-12 days
+3 to +5
  • Apply 2,4-D ethyl - ester granules @ 0.8 kg 2/ha Butachlor or Benthiocarb (1kg /ha for light soils / 1.5 kg a.i/ha for heavy soils)
Nutrient Management
Zone Season Stage N P K Zn
Kg/acre
U.P Plains

Rabi

a) Last puddling 15 20 16-20 20(40kg in acid and alkaline soils)
b) 15 days after Transplanting 15 -- -- --
c) 30 days after Transplanting 15 -- -- --
Water Management
0
  • Less water depth (2-3 cm) for easy and shallow transplantation
+1 to + 2
  • Increase the level of water in the field (5-7 cm) for better establishment of seedlings
+3 to 40
  • Maintain shallow water depth (2-3 cm)
+30 to 32
  • Drain the water completely and dry for two days(only for heavy soils)
+35 to+65
  • Increase water level in the field (5-7 cm) Most critical period for moisture
+70 to 85
  • Reduce water depth to (2-3 cm)
+85
  • Gradually with draw water from field (for matuation and easy harvest)
Pest and disease management
  • Monitor the pest and disease incidence and accordingly the plant protection measures have to be taken up.
Post production
+90 to 100
  • Crop may attain physiological maturity.
  • Drain the field 10-15 days before harvest .
  • Harvest the crop around 20-25% moisture in the grain.

Top

 

Management time table for Southern Zone_Rabi

Note: Time table is for a medium duration variety (120 days). Numbers refers to days after transplanting (DAT)

-25
0
20
35
60
65
100
Nursery Management
Planting
Max tillering
P.I
Heading
Flowering
Maturity

Pre-Plant Management
Nursery Management(10% of transplanted area)
-30
  • Plough the field
  • Apply 200-300 kg FYM/100 m2
  • Flood the field and Puddle thoroughly
-25
  • Raise seed beds - 1 ½ m width - convenient length -30 cm channels in between beds
  • Apply 1kg N + 0.5 kg P2O5 +0.5 kg K2O/ 100 m2
  • Broadcast the seed uniformly
  • Avoid excess water
-27
  • 5-6 kg seed / 100m2
  • Remove ill -filled grain (2% salt water)
  • Thiram / Captan treatment (3g/kg seed)
  • Incubate for 24-36 hours
Land Preparation
-10 to -15
  • First puddling
  • Add green manure-incorporate / Apply FYM
-3 to -5
  • Give second puddling
-1
  • Give third puddling
  • Allow allays of 20 cm for every 2m width
  • Level the land perfectly
Crop Establishment
0
  • Maintain 3+- 2 cm water level
  • Transplant young (25 days age) seedlings (4-6 leaf stage) Shallow (2-3 cm depth), close (20 x 15 cm) planting advantageous
  • See that there should be 33 seedlings / m2
  • Increase seedling number (close spacing) if planting is delayed or less fertile soil
+12 to +15
  • Fill gaps by transplanting
Weed Management
Note: Timing of herbicide application is very important relevant to the day of last puddling but not the day of transplanting.
-20 to -25
  • Spary 2,4-D sodium salt (5-12 kg/ha) on fresh growth of Cyperus (if Cyperus weed intensity is high)
  • Plough after one week of spray
  • Plant paddy after 20-25 days
-10 to +12
  • Spray glyphosate (2.5 - 3.5l/ha) on fresh growth of Cyperus (if Cyperus weed intensity is high)
  • Plough after one week of spray
  • Plant paddy after 10-12 days
+3 to +5
  • Apply 2,4-D ethyl - ester granules @ 0.8 kg 2/ha Butachlor or Benthiocarb (1kg /ha for light soils / 1.5 kg a.i/ha for heavy soils)
Nutrient Management
Zone Season Stage N P K Zn
Kg/acre
Southern zone

Rabi

a) Last puddling 16 24

16 (Heavy Soils)

8 (Light Soils)

--

b) Tillering stage 16 -- -- --
c) Panicle initiation stage 16 -- 8 (Light Soils) --
Water Management
0
  • Less water depth (2-3 cm) for easy and shallow transplantation
+1 to + 2
  • Increase the level of water in the field (5-7 cm) for better establishment of seedlings
+3 to 40
  • Maintain shallow water depth (2-3 cm)
+30 to 32
  • Drain the water completely and dry for two days(only for heavy soils)
+35 to+65
  • Increase water level in the field (5-7 cm) Most critical period for moisture
+70 to 85
  • Reduce water depth to (2-3 cm)
+85
  • Gradually with draw water from field (for matuation and easy harvest)
Pest and disease management
  • Monitor the pest and disease incidence and accordingly the plant protection measures have to be taken up.
Post production
+95 to 100
  • Crop may attain physiological maturity
  • Drain the field 10-15 days before harvest
  • Harvest the crop around 20-25% moisture in the grain.

Top

Management time table for Scarce rainfall Zone-Rabi

Note: Time table is for a medium duration variety (120 days). Numbers refers to days after transplanting (DAT)

-25
0
20
35
60
65
100
Nursery Management
Planting
Max tillering
P.I
Heading
Flowering
Maturity

Pre-Plant Management
Nursery Management(10% of transplanted area)
-30
  • Plough the field
  • Apply 200-300 kg FYM/100 m2
  • Flood the field and Puddle thoroughly
-25
  • Raise seed beds - 1 ½ m width - convenient length -30 cm channels in between beds
  • Apply 1kg N + 0.5 kg P2O5 +0.5 kg K2O/ 100 m2
  • Broadcast the seed uniformly
  • Avoid excess water
-27
  • 5-6 kg seed / 100m2
  • Remove ill -filled grain (2% salt water)
  • Thiram / Captan treatment (3g/kg seed)
  • Incubate for 24-36 hours
Land Preparation
-10 to -15
  • First puddling
  • Add green manure-incorporate / Apply FYM
-3 to -5
  • Give second puddling
-1
  • Give third puddling
  • Allow allays of 20 cm for every 2m width
  • Level the land perfectly
Crop Establishment
0
  • Maintain 3+- 2 cm water level
  • Transplant young (25 days age) seedlings (4-6 leaf stage) Shallow (2-3 cm depth), close (20 x 15 cm) planting advantageous
  • See that there should be 33 seedlings / m2
  • Increase seedling number (close spacing) if planting is delayed or less fertile soil
+12 to +15
  • Fill gaps by transplanting
Weed Management
Note: Timing of herbicide application is very important relevant to the day of last puddling but not the day of transplanting.
-20 to -25
  • Spary 2,4-D sodium salt (5-12 kg/ha) on fresh growth of Cyperus (if Cyperus weed intensity is high)
  • Plough after one week of spray
  • Plant paddy after 20-25 days
-10 to +12
  • Spray glyphosate (2.5 - 3.5l/ha) on fresh growth of Cyperus (if Cyperus weed intensity is high)
  • Plough after one week of spray
  • Plant paddy after 10-12 days
+3 to +5
  • Apply 2,4-D ethyl - ester granules @ 0.8 kg 2/ha Butachlor or Benthiocarb (1kg /ha for light soils / 1.5 kg a.i/ha for heavy soils)
Nutrient Management
Zone Season Stage N P K Zn
Kg/acre
Scarce Rain fall zone

Rabi

a) Last puddling 28 32

32 (Heavy Soils)

16 (Light Soils)

--

b) Tillering stage 28 -- -- --
c) Panicle initiation stage 28 -- 16 (Light Soils) --
Water Management
0
  • Less water depth (2-3 cm) for easy and shallow transplantation
+1 to + 2
  • Increase the level of water in the field (5-7 cm) for better establishment of seedlings
+3 to 40
  • Maintain shallow water depth (2-3 cm)
+30 to 32
  • Drain the water completely and dry for two days(only for heavy soils)
+35 to+65
  • Increase water level in the field (5-7 cm) Most critical period for moisture
+70 to 85
  • Reduce water depth to (2-3 cm)
+85
  • Gradually with draw water from field (for matuation and easy harvest)
Pest and disease management
  • Monitor the pest and disease incidence and accordingly the plant protection measures have to be taken up.
Post production
+95 to 100
  • Crop may attain physiological maturity
  • Drain the field 10-15 days before harvest
  • Harvest the crop around 20-25% moisture in the grain.

Top

Andhra Pradesh